What a complete design package contains — and what it does not
A buildable package is a set of documents a fabricator can quote and build from without reinterpretation. A concept image is not a design package and cannot be priced responsibly. Here is what has to be in the box.
7 min read · updated 2026-10-24
The test for a design package
A design package is finished when a competent fabricator can quote it, build it to, and be held to it — without asking a single question that would change the price. Until that is true, the project is a conversation with a price attached, and every unanswered question is a change order waiting to happen.
What has to be in it
Eight groups of documents. The list is deliberately boring: boring completeness is what protects the budget.
- Scope and interface document — what is in, what is out, and how it meets the surroundings
- Dimensioned drawings and models — geometry, tolerances, fixings, and the parts that are site-specific
- Technical specification — materials, grades, finishes, coatings, and the standard each is bought against
- Engineering review — structural, electrical or control calculations, with the assumptions stated
- Standards and testing — which clause applies, and what evidence is expected
- Fixing and interfaces — how it attaches, what it attaches to, and who is responsible for the substrate
- Finish and appearance reference — colour, texture, gloss and the sample that defines them
- Maintenance and inspection notes — what is checked, how often, and by whom
What is not a design package
Rendered imagery, mood boards and a general arrangement drawing are useful for deciding direction, and they are not procurable documents. A quotation priced against them is a guess, and the difference between the guess and the product is absorbed by somebody.
The honest test: can two different manufacturers quote the same thing from the same package? If yes, the package is doing its job.
If a supplier can quote without asking questions, the package is complete. If they ask, you have found a gap before production, not after.
The risk that is usually missed
The hardest part of most bespoke work is not the object; it is the interface between the object and everything around it. Structure, drainage, power, lighting, fixings into substrates that were surveyed months earlier, and the tolerance between something drawn to a millimetre and a building that was built to a millimetre.
Interface risk is resolved in the documentation, or it is paid for on site.