Skip to content

About AQUASEE

Between the drawing and the opening day.

Bring us a tourism, public-space or children’s play project and we will plan it, design it and organise the supply chain that builds it — including the parts that usually get left to you.

What AQUASEE is

AQUASEE is a China-based service company for developers, operators and design practices working on tourism, public-space and children’s play projects. It provides three connected capabilities: early-stage consulting that defines and scopes the work, creative design and R&D that makes it buildable, and organised supply chain management through production, logistics, installation and handover. It is not an equipment manufacturer; production runs through specialist manufacturing partners it selects, briefs, inspects and verifies, and it remains accountable for the result.

Facts

At a glance.

Base
China, working with clients worldwide
Capabilities
Strategy and consulting · Creative design and R&D · Supply chain and delivery
Operating languages
English · 中文 · العربية · Русский
Production model
No owned factories; a qualified partner network, briefed and verified by us
Client sectors
Resorts and tourism · Public space · Theme and leisure · Children’s learning and play spaces
Delivery models
Complete delivery · Client-assembled kit · Semi-finished modules

The supply chain

How much is left between the order and the opening day.

A factory quote covers the manufacture. Everything around it — the parts of the drawing that do not exist yet, the interfaces on site, the changes after the order, the paperwork — is still on your desk. That part is the job.

  1. 01The parts the drawing does not coverHow the piece meets structure, drainage, power and lighting. How it is fixed. How it is cleaned, maintained and opened. We settle these before they turn into variations on site.
  2. 02A change is a conversation, not a new invoiceThe cost plan and the change log are held by one party. When the design moves, you see what it does to the whole project — not what it does to one purchase order.
  3. 03One specification, not fiveEvery supplier works to the same written specification, with inspection at agreed milestones and records handed over at completion.
  4. 04Shipping is not installationCustoms, wooden packing and quarantine, night work around a venue that stays open, commissioning, training and the handover pack.
  5. 05What you actually receiveAn installed, commissioned, maintainable asset — and one party answerable for it from the first sketch to the day it opens.

Delivery models

Three ways to take delivery, and what each one costs you.

01

Complete delivery

We take the brief and hand over a finished, commissioned installation. The client signs one contract and accepts one deliverable.

Your role
Brief, approve, sign off. On site presence only for the parts of the programme that need your decision or your access.
Best for
Owners and operators who want a single accountable party and do not want to manage a supply chain themselves.
Trade-off
The highest single price, and the least transparency into unit-level costs unless you ask for an open-book breakdown.
02

Client-assembled kit

We design and produce a complete kit that your own team assembles on site, with written instructions and a support window.

Your role
Receive, assemble, commission, maintain. You provide site labour and the tools.
Best for
Clients with an existing facilities or construction team that can carry out installation economically.
Trade-off
Lower cost, but assembly quality depends on the team you put on it, and the programme needs more supervision from your side.
03

Semi-finished modules

We produce modules that only need final assembly, fixings and commissioning on site — the heaviest and most awkward work stays in the workshop.

Your role
Position modules, complete connections, commission and hand over to operations.
Best for
Oversized or site-constrained work, international shipping, or sites where fabrication on site is impractical.
Trade-off
The best option for complex geometry and long logistics chains, and the one that needs the most careful planning early.

Comparison

Who does what.

Four routes to the same outcome. They are not interchangeable, and the honest answer usually depends on what your organisation already has.

Four routes to the same outcome. They are not interchangeable, and the honest answer usually depends on what your organisation already has.
DimensionAQUASEEDesign studioTrading platformFactory
Who holds the briefOne team holds it across consulting, design and deliveryHolds it through design, then hands it onHolds it as a transactionHolds it from the drawing you send
Design includedYes — concept, specification and buildable documentationYes, usually to concept or technical designNo — you supply the fileUsually production drawing only, from your file
Production capacitySelected and managed partners, none ownedNone — they subcontractNone — they connect you to suppliersOwned
Quality controlHeld by us against one specification, with inspection recordsAdvice only; you own the factory relationshipVariable; typically per-supplierSelf-inspection against your own order
Largest risk left with youJudgement calls — scope, money and timeline trade-offsThe gap between the drawing and the siteQuality, delivery and the gap between what you expectedEverything between the brief and the invoice
Best whenThe project is complex, cross-disciplinary and you want one party answerable for the outcomeYou need design quality and will run delivery yourselfThe item is standard and price is the only variableYou have a production-ready drawing and a simple order

We are describing our own model accurately, not ranking the others. If you have a standard product and a finished drawing, a factory is the right choice — and we will tell you so. This site is for the other case: when the design, the interfaces and the site are still open questions.

Cost

What moves the number.

We do not publish price ranges. These are the factors that decide them.

  1. 01Whether an item is bespoke or adapted from an existing, proven platform
  2. 02Material specification and finish — marine-grade and coastal exposure change the bill materially
  3. 03Tooling: every new mould, jig or fabrication method is a one-off cost that a repeat order would not carry
  4. 04Engineering hours: structural, electrical and control design, and the drawings that make an item buildable
  5. 05Prototyping and testing, including load and safety testing where the use case requires it
  6. 06Logistics: dimensions, weight, packaging and whether the item travels as one piece or several
  7. 07Site conditions — access, working hours, whether the venue stays open, and how much installation is done in the dark
  8. 08Commissioning, training, documentation and the support window you buy

Boundaries

What we do not do.

  • Production is carried out by qualified manufacturing partners — we brief them, inspect at agreed milestones and accept the work.
  • We do not publish client projects without written authorisation, and we do not present concept work as delivered work.
  • We do not take on work we believe cannot be delivered responsibly for the budget and programme stated.
  • We do not provide legal, structural-engineering or certification services; we engage qualified specialists and hold them to the brief.
  • We do not quote from a concept image alone — we need enough of a specification to be responsible for a price.

Glossary

The words we use, defined.

Capability study
A description of the scope, method and outcome of a typical engagement, used to show how we work when published client projects are not available.
Brief
The written statement of what a project must achieve, its constraints and its success criteria. It is the document every later decision is tested against.
Buildable specification
A drawing and specification set that a fabricator can quote and build from without reinterpretation — not a concept image.
Controlled change
Any change to an agreed scope, specification or programme, recorded with its cost and schedule effect before it is implemented.
Delivery model
How the work is handed over: complete delivery, a client-assembled kit, or semi-finished modules.
First article
The first production unit, inspected against the specification before the rest of the run is released.
Handover pack
The documentation set left with the client at completion: drawings, materials, certificates, maintenance instructions and spare-parts information.
Partner network
The qualified fabricators and specialists we select per project, against a stated capability and record — not employees, and not owned factories.
Qualification
The check that a partner has the capability, capacity and record for the specific work before it is contracted.
Specification
The written description of what a product is, what it must do, and the standards it must meet — the single document production is judged against.

Tell us what you are trying to build.

The same six stages apply everywhere. What changes between projects is the length of each stage, not the sequence.

Start a Project